TITLE: DB REPLACEMENT AND INSTALLATION
We supplied and installed 78 Numbers of Schneider DBs with all its components across various locations within the mall.
TITLE: BMS system upgradation at Haima Hospital
At the ministry of health hospital, we did a major BMS system upgradation work by installing several FCU controllers and VAV controllers with its communication systems across multiple Outstations. Starter panels for VFD was also incorporated in the upgradation.
TITLE: Removal of Sign board and supply of power to the totem Signage
Using a High boom crane the external sign boards on the sides of the buildings were removed and dismantled. We supplied the power cable to new the signage totem located at the parking lot by removing the existing interlocks and re fixing them once completed.
TITLE: Supply of Floor Tiles
We Supplied 4000 Number (1500 sqm) of tiles from Quarella (Italy) to Qurum City Center.
TITLE: Supply and installation of New VFD panel with BMS provision for AHU
Supplied, installed and programmed 5.5 KW VFD panel while providing a bypass option for AHU in steel sheet enclosure with form –II construction. We also supplied Siemens standalone DDC controllers with field sensors and integrated it all into the BMS system.
TITLE: Cabling works for the New Accommodation camp at PDO Qarn AL Alam
Provided several structured cabling works for various accommodation facilities. We provided cabling for PA systems, IPTV systems, Network switches, Wi-Fi access points and IP Telephones.
TITLE:Replacement and refurbishment of Emergency exit doors
Replaced and refurbished 60 Emergency exit doors by replacing the pushbar and handle fittings. Supplied & installed 10 Emergency exit doors of various sizes with its accessories.
TITLE:Supply of Customized thermostat and retrofit of valves for FCU and AHU
We supplied customized bespoke gold finish thermostat with customized buttons. Installed new valves for multiple FCU’S and AHU’S.
TITLE:Civil & MEP modification works
Construction of 200mm thick fire rated block work wall with RCC lintel between two shops. Dismantling and removal of existing pop up units and providing hoarding.
TITLE:Installation of New Strap on type BTU meter in the CHW pipe line
We had installed 27 numbers of BTU Transducers/Flow sensors on the CHW pipe line with straps.
TITLE:Demolition of Forever 21 shop
Demolished 700 sqm of building materials such as the floor and wall tiles, false ceiling, interior decorations and wooden counters from the Forever 21 shop after its closure
TITLE:Supply and installation of IP CCTV system in Tuyan Residential complex
Supplied and installed multiple CCTV cameras and its accessories across several locations in the residential complex.